Beyond the Storm: How Co-ops Are Preparing For and Responding to Emergencies (CIN Ideas for Innovation Webinar Series)

CIN Admin
CIN Admin
  • Updated
Resource Type Webinar
Author / Source Co-op Innovation Network (CIN)
Publication Date July 2026
Location Multi-state (Idaho, Louisiana, Colorado; approaches applicable nationally)
Initiative Type Technology, Program, Partnership
Project Complexity Advanced
Recommended For Board, Staff

View Webinar

Estimated viewing time: 60 minutes


Why This Matters for Rural Electric Co-ops

Emergencies are one of the largest cost and liability exposures a co-op faces. A single storm or wildfire can mean hundreds of broken poles, days of lost service, heavy restoration bills, and, in fire-prone territory, the risk that co-op equipment ignites a catastrophic fire. This webinar puts three practical responses side by side: national-lab modeling tools that predict near-term damage and long-term climate risk, a tiered hurricane response plan built from real storm experience, and a wildfire public safety power management (PSPM) program that deliberately trades some reliability for reduced ignition risk.

For co-op leaders, the value is in the specifics they can borrow. A co-op can benchmark its own emergency plan against DEMCO's tier structure and its documentation discipline, which determines how much restoration cost FEMA reimburses rather than passing it to members. It can weigh La Plata's enhanced power safety settings and public safety power shutoffs as ways to reduce wildfire liability, and it can apply for free U.S. Department of Energy technical assistance to test Idaho National Laboratory's StormDepart and Acclimate tools at no cost beyond staff time.


Key Takeaways

Idaho National Laboratory's Resilience Guard bundles near-term damage prediction (StormDepart), long-term climate and demographic risk (Acclimate), a 1,400-plus fragility-curve library, and an AI resilience engine into one platform.
DEMCO ties every crew hour, pole, meal, and contract to work orders because thorough FEMA documentation recovers reimbursement that would otherwise fall on members, and its tiered plan pre-negotiates storm rates for crews, catering, lodging, and fuel.
La Plata layers vegetation management, system hardening, AI risk modeling, and enhanced power safety settings, crediting the settings with preventing five ignitions in one fire season while keeping each restoration under 24 hours.
Both distribution co-ops treat member communication as central to emergency response and push updates across every channel. Notably, La Plata declines to give estimated restoration times, while DEMCO automates them from its outage system.

Implementation Considerations

  • Cost or Funding Requirements: Undergrounding and battery storage were raised as ideal but frequently cost-prohibitive. Both co-ops described them as actively studied yet limited by cost of service. Grants (La Plata used a $50,000 award for one right-of-way project) and free DOE technical assistance can offset early costs.
  • Staffing or Technology Requirements: These programs assume real capacity. DEMCO relies on dedicated systems-operations staff and a mobile command center, and La Plata contracts a third-party AI risk firm (Firescape) plus a growing network of its own weather stations (23 feeds, three co-op-owned, four more planned). Smaller co-ops will likely need mutual-aid agreements, regional collaboration, or shared services to reach a comparable level.
  • Time-Sensitive Information: The availability of DOE Office of Electricity technical assistance, the INL tools' release timing, and grant programs can shift. Confirm current status before building a plan around any of them.

Notable Examples

  • Idaho National Laboratory: Developed Resilience Guard, integrating StormDepart (near-term damage prediction), Acclimate (long-term climate and demographic risk modeling), a public fragility-curve library, and the RAISE AI resilience engine.
  • DEMCO (Louisiana): Shared a hurricane emergency response plan approved by the Louisiana PSC and board, with three response tiers, mutual-aid activation, and rigorous FEMA cost documentation.
  • La Plata Electric Association (Colorado): Runs a public safety power management (PSPM) program combining vegetation management, drone inspections, enhanced power safety settings (EPSS), and public safety power shutoffs (PSPS).
  • Firescape: Third-party wildfire, energy, and weather team providing hourly AI risk scoring and 7-day forecasts calibrated to La Plata's assets and microclimates.
  • U.S. DOE Office of Electricity: Funded the INL tools and offers free technical assistance for utilities to adopt them.
  • Fire Adapted Colorado: Ambassador program that secured member buy-in for La Plata's Los Ranchitos right-of-way clearing project.
  • Association of Louisiana Electric Cooperatives: Mutual-aid coordinator DEMCO calls to source outside crews by tier and customer count.

View Webinar

Estimated viewing time: 60 minutes

Related to

Was this article helpful?

Comments

0 comments

Please sign in to leave a comment.