Why This Matters for Rural Electric Co-ops

More than 125 electric cooperatives serve military installations across 41 states. Several are now planning microgrids that can keep a base running if the bulk grid goes down from a hurricane, extreme weather, or a human-caused threat.

For co-ops that serve a base or another critical campus (such as a hospital, university, or industrial park), these short profiles show how one high-value customer can become an entry point into co-op-owned distributed energy resources (DERs). Leaders can use the article as a quick source of peer ideas before scoping a project or approaching a large critical-load member.


Key Takeaways

Co-ops are well positioned to run base microgrids because many already own, operate, or maintain on-base electric systems under long-term contracts.
A microgrid built for one critical customer can give a co-op storage and controls experience that may help manage peak loads across its system.
Early cost/benefit modeling can reveal simpler options. A single substation-level microgrid may cover a whole site at lower capital cost than several small ones.
Shared planning tools can cut microgrid soft costs like data analysis, mapping, and design, and they apply to hospitals, universities, and industrial parks too.

Implementation Considerations

  • Regulatory or Governance Considerations: Base microgrids depend on military approvals and contract terms. Projects can stall at federal design and cost review, or when a base must get permission to move away from its current supplier.
  • Staffing or Technology Requirements: Owning and operating a microgrid that fully isolates from the grid calls for specialized engineering and controls expertise. Co-ops building that capacity can draw on planning tools, NRECA Research, and peer co-ops.
  • Time-Sensitive Information: All three projects were in early planning or approval stages as of November 2024. Check current status with each co-op before citing outcomes.

Notable Examples

  • Choctawhatchee Electric Cooperative (CHELCO): Planning its first co-op-owned DER, a microgrid at Eglin Air Force Base in Florida that can fully isolate from the grid.
  • High West Energy: Designing a microgrid for F.E. Warren Air Force Base in Wyoming, pending U.S. Army Corps of Engineers review.
  • Sussex Rural Electric Cooperative (Sussex REC): Operates the on-base electric system at Picatinny Arsenal in New Jersey and is seeking approval to run a microgrid there.
  • NRECA Research: Built the MicrogridUP planning tool with CHELCO, Sussex REC, and Rio Grande Electric Cooperative in Texas, supported by a Department of Defense grant.